The bridge over the Christina River in Wilmington is having some work done to it. In order for the contractor to be able to apply new coatings to the bridge it first has to be prepared.

This week we shot blasted 425,000 square feet on the north bound side of 495.

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Time limit is exhausted. Please reload CAPTCHA.

+ 83 = 89